Esau Holmes has secured a lease for the pizzeria's second location, slated to open in 60 to 90 days on Northside drive
The community space will also double as the new base of operations for the nonprofit.
Pizzeria—the second in Atlanta for the Nashville-based company—was originally planning a March 20 debut. Then COVID-19 hit.
Grand opening block party has been tentatively planned for Saturday, March 21 following a debut the day before.
For the first time in Atlanta BeltLine’s history, three segments are under construction concurrently.
Southside Trail-West, the first stretch to be built, is a 0.75-mile portion of the overall four-mile southside corridor.
Youth development organization since 2010 has been operating out of a basement at 982 Murphy Avenue.
Nashville-based pizzeria has a second location under construction in Adair Park, slated to debut fall 2019.
Plans this week were filed to develop land where the restaurant will be built from the ground up.
Search